Custom Joinery
— PILLAR 03 / CUSTOM JOINERY

Custom Joinery & Bespoke Carpentry in Dubai & Abu Dhabi

Kitchens, wardrobes, panelling and bespoke furniture made in our own workshop and installed by our own fitters.

GET A FREE QUOTE
— 01 / OVERVIEW

What custom joinery covers.

Our joinery is made in our own workshop, not bought in and badged. That single fact controls quality, lead time and price. We produce custom kitchen cabinets, built-in and walk-in wardrobes, TV and media units, wall panelling, bathroom vanities, doors and freestanding furniture for homes across Dubai and Abu Dhabi. Carcasses are moisture-resistant board rated for UAE humidity, edges are laser-bonded, and hardware is Blum or Hettich as standard with a written warranty. Site dimensions are laser-surveyed after first fix, sheets are cut on our CNC, spraying happens in a controlled booth, and installation is done by the same fitters every time. Typical lead time from approved shop drawing to installed unit is four to six weeks.

— 03 / WHY YP INTERIOS FOR JOINERY

Why clients choose us for custom joinery.

01

Our workshop, our machines

CNC cutting, edge banding and a dedicated spray booth — no third-party workshop margin.

02

Built for UAE humidity

Moisture-resistant carcasses, sealed edges and marine-grade board in bathrooms and outdoor kitchens.

03

Blum and Hettich as standard

Soft-close hinges and runners with manufacturer warranty, not unbranded substitutes.

04

Laser-surveyed, not guessed

Every unit is drawn to the measured opening, so scribes and gaps stay tight.

— 04 / OUR PROCESS

How a joinery project runs.

  1. 01

    Design & measure

    Site survey, storage audit and a layout drawn around what you actually store.

    WEEK 0

  2. 02

    Shop drawings & samples

    Elevation drawings, finish samples and hardware selection for sign-off.

    1 WEEK

  3. 03

    Fixed quotation

    Priced per unit with hardware, stone and appliance allowances stated.

    2–3 DAYS

  4. 04

    Workshop production

    CNC cutting, assembly, spraying and quality check before dispatch.

    3–5 WEEKS

  5. 05

    Installation & adjustment

    Fitting, stone templating, alignment and a 12-month warranty on hardware and finish.

    3–7 DAYS

— 05 / RELATED PROJECTS

Recently delivered.

VIEW FULL PORTFOLIO →
Open-Plan Kitchen Rebuild — Dubai Hills Estate, Dubai

Custom Kitchen Cabinets

Open-Plan Kitchen Rebuild

Dubai Hills Estate, Dubai

VILLADUBAI HILLS7 WEEKS
Walk-in Wardrobe Suite — Al Barsha, Dubai

Walk-in Wardrobes

Walk-in Wardrobe Suite

Al Barsha, Dubai

VILLAAL BARSHA5 WEEKS
— 06 / FAQ

Questions we are asked most.

Yes. Cutting, edge banding, assembly and spraying happen in our own UAE workshop, which is why lead times and finish quality stay under our control.

Four to six weeks from approved shop drawings to installation, plus stone templating and fitting of a further week.

Moisture-resistant board with sealed edges for general use, and marine-grade substrates in bathrooms, laundries and outdoor kitchens.

Blum or Hettich soft-close hinges and runners as standard, with the manufacturer warranty passed to you.

We colour-match sprayed finishes and source veneers to sample so new units sit alongside existing work without a visible break.

Yes — quartz, porcelain and natural stone are templated after cabinet installation and fitted by our own stone team.

— REQUEST / FREE QUOTE

Get a free quote

We'll call you back within one business day.

+971
— 08 / TALK TO US

Tell us about your project.

A free site visit anywhere in Dubai or Abu Dhabi, followed by a written fixed-price quotation — no obligation.

CALLWHATSAPPGET QUOTE