Kitchen Renovation in Dubai by YP Interios
— DUBAI · UAE

Kitchen Renovation in Dubai

Dubai kitchens reconfigured, rebuilt and fitted with workshop-made cabinetry and stone, under one fixed-price contract.

FROM AED 65,000FREE SITE VISITDUBAI CREW
  • DUBAI TEAM
  • FIXED-PRICE CONTRACT
  • PERMITS HANDLED
  • 12-MONTH WARRANTY
— 01 / DUBAI CONTEXT

Opening up the closed developer kitchen.

The single most requested job in Dubai homes is removing the wall between a closed developer kitchen and the dining room. Handover kitchens in Ranches, Springs, Dubai Hills and most Emaar apartments were laid out for staff use behind a door — narrow runs, one small window, and services clustered where the original contractor found it cheapest. Opening that up is rarely just demolition: the wall may be loadbearing, the extract has to be re-routed, and in a tower the riser positions are simply not negotiable.

We survey the wall, get a structural consultant's drawing where one is needed, and quote the whole thing as one sum — demolition, MEP diversions, cabinetry from our own workshop, stone templating, appliances and making good. Dubai villa kitchens usually run seven to nine weeks; tower apartments run longer because material moves have to fit the building's service lift booking.

Permanent Dubai team

Directly employed crews based in Dubai, supervised daily rather than visited twice a week.

One fixed price

A single contract sum itemised room by room, with no provisional sums quietly inflating at the end.

Approvals handled

We prepare and lodge every Dubai permit and community approval your kitchen renovation needs.

12-month warranty

Workmanship warranted for twelve months, attended by the same team that carried out the work.

— 02 / WHAT'S INCLUDED

What's included in our kitchen renovation in Dubai

The written scope of work every contract carries as standard.

  • Survey, appliance measurement and a working-triangle layout study
  • 3D visuals of the kitchen with door finishes, handles and worktop options
  • Strip-out of existing cabinetry, worktops, tiling and appliances
  • Plumbing alterations for sink, dishwasher and water filter positions
  • Electrical upgrades for hob, oven, extractor and under-cabinet lighting
  • Extraction ducting routed to an external wall or recirculating with carbon filters
  • Wall preparation, splashback tiling or stone upstands
  • Cabinetry manufactured in our workshop with Blum soft-close hinges and runners
  • Worktop templating, fabrication and installation in quartz, granite or sintered stone
  • Appliance installation, commissioning, silicone finishing and handover
— 03 / PROCESS

How the work runs, step by step.

  1. 01

    Survey & layout

    Measure the room, confirm appliance sizes and plan the working triangle.

    WEEK 0

  2. 02

    Design & fixed quote

    3D visuals, door and worktop selection, and one fixed price for the whole scope.

    1 WEEK

  3. 03

    Workshop manufacture

    Carcasses and fronts cut, edged, sprayed and quality-checked in our workshop.

    3–4 WEEKS

  4. 04

    Strip-out & services

    Old kitchen removed, plumbing and electrical adjusted, walls prepared and tiled.

    1 WEEK

  5. 05

    Install & commission

    Cabinets fitted, stone templated and installed, appliances connected and tested.

    1–2 WEEKS

— 04 / APPROVALS

Approvals and permits in Dubai

Removing a kitchen wall in Dubai needs a developer or building-management NOC, and a Dubai Municipality modification permit where the wall is structural or a wet area moves. Towers add a fit-out approval from building management, with contractor insurance, service lift bookings and restricted noisy-work hours. We assemble the whole pack and manage the site access passes.

  • Dubai Municipality building modification permits, prepared and lodged by us
  • Dubai Development Authority (DDA) submissions for TECOM and free-zone communities
  • Developer NOCs — Emaar, Nakheel, Dubai Properties, Damac and Meraas
  • Contractor registration, third-party insurance and site access passes
— 05 / SPECIFICATION

Materials and finishes we work with

  • Moisture-resistant MDF carcasses
  • Matt & gloss lacquer fronts
  • Walnut and oak veneer doors
  • Caesarstone & Silestone quartz
  • Dekton & Neolith sintered stone
  • Blum soft-close hinges and runners
  • Franke & Blanco sinks
  • Bosch, Siemens & Miele appliances
  • Handleless J-pull profiles
  • Under-cabinet LED strips
— 06 / GALLERY

Recent kitchen renovation work

— 07 / COST

What does kitchen renovation cost in Dubai?

STARTING FROM AED 65,000

STANDARD

AED 65,000 – 120,000

  • Apartment kitchen, same layout
  • New cabinetry and quartz worktop
  • Appliance swap and making good

PREMIUM

AED 120,000 – 260,000

  • Wall removed, island added
  • MEP diversions and new extract
  • Full-height pantry joinery

LUXURY

AED 260,000+

  • Villa kitchen plus prep kitchen
  • Book-matched stone and veneer
  • Integrated premium appliance package

Every Dubai quotation follows a free measured site visit — we never price from photographs, and the contract sum is fixed once signed.

REQUEST AN ESTIMATE
— 08 / AREAS SERVED

Kitchen Renovation across Dubai

57 Dubai kitchens rebuilt, from Marina apartments to Dubai Hills family villas.

They booked the service lift, worked inside the building's hours and still finished the whole kitchen in eight weeks.
S. Iqbal · Dubai Marina, Dubai
SIGNATURE VILLA TURNKEY FIT-OUT · PALM JUMEIRAHFAMILY VILLA RENOVATION · EMIRATES HILLSOPEN-PLAN KITCHEN REBUILD · DUBAI HILLS ESTATE
— 09 / FAQ

Kitchen Renovation in Dubai, answered.

Seven to nine weeks on site for a Dubai villa kitchen, and nine to eleven for a tower apartment where material moves depend on service lift bookings. Stone templating adds a week after cabinets are installed.

Usually yes, but not on assumption. If the wall is structural we need a consultant's drawing and a Dubai Municipality permit, plus a developer NOC. We check before pricing, not after demolition.

From AED 65,000 for an apartment kitchen in the same layout, AED 120,000 to 260,000 for a reconfigured villa kitchen with an island, and above that for prep kitchens and premium appliance packages.

Yes. Cutting, edge banding, assembly and spraying happen in our own Al Quoz workshop, so lead times and finish quality stay under our control rather than a supplier's.

Quartz for everyday family kitchens, sintered stone or porcelain where a hot pan risk exists, and natural marble only where the client accepts patina. All are templated after cabinet installation.

Yes. Most Dubai towers restrict noisy work to Sunday–Thursday daytime windows. We sequence demolition and drilling into those windows and register the crew with building management.

— REQUEST / FREE QUOTE

Get a free quote

We'll call you back within one business day.

+971
— 11 / TALK TO US

Free site visit anywhere in Dubai.

We measure the space, agree the scope and follow up with a written fixed-price quotation for your kitchen renovation within three working days.

+971 58 587 4842 WHATSAPP US

Sun–Thu 08:00–18:00 · Sat 09:00–14:00

CALLWHATSAPPGET QUOTE