Bathroom Renovation in Dubai & Abu Dhabi
A bathroom rebuilt from the waterproofing up, flood tested before tiling, and finished in under three weeks.
Get a free quote
We'll call you back within one business day.
- 24-HOUR FLOOD TEST
- SIKA MEMBRANE SYSTEM
- LICENSED PLUMBERS
- TEST RECORDS SUPPLIED
Every bathroom that fails, fails at the membrane.
Bathroom renovation in Dubai is judged on tiles and sold on tiles, which is why so many leak within two years. Cheap crews tile directly over an old screed, skip the tanking behind the shower, run silicone instead of forming a proper upstand, and never flood test. The damage shows up in the room below or in a neighbour's ceiling, and by then the tiling has to come out again. Add falls set by eye rather than by laser and a floor waste that ponds, and a new bathroom looks tired within a season.
We rebuild in the correct order and prove each stage. The room is stripped to structure, drainage is checked and re-set with verified falls, a Sika or Fosroc membrane is applied to the floor and up the walls to full shower height, and the room is flood tested for twenty-four hours with photographic records before a single tile is laid. Only then do screeds, tiling, sanitaryware, glass and joinery follow. You receive the test record in your handover file, and a twelve-month workmanship warranty backed by the membrane manufacturer's system warranty.
Membrane before tiling
Full tanking to floor and shower walls, applied by trained applicators.
Documented flood test
Twenty-four hours of standing water, photographed and recorded before tiling.
Laser-set falls
Gradients checked to the waste so the floor drains instead of ponding.
Moisture-rated joinery
Vanities built in-house from moisture-resistant board with sealed edges.
What's included in our bathroom renovation
The written scope of work every contract carries as standard.
- Survey of drainage position, falls, ventilation and existing waterproofing condition
- 3D layout showing sanitaryware positions, tiling setting-out and niche locations
- Strip-out to structure including old tiling, screed and sanitaryware
- Drainage and supply pipework replacement in CPVC or PPR with pressure testing
- Electrical works: shaver points, extract fan, mirror lighting and underfloor heating where specified
- Sika or Fosroc waterproof membrane to floor and shower walls with corner reinforcement
- Twenty-four hour flood test with photographic record supplied to you
- Screeding to verified falls, wall and floor tiling with matched grout and trims
- Sanitaryware, brassware, shower glass and accessory installation
- Bespoke vanity unit, mirror, silicone finishing, snagging and handover file
How the work runs, step by step.
- 01
Survey & layout
Drainage, falls and ventilation checked, then the sanitaryware layout set out.
WEEK 0
- 02
Selection & fixed quote
Tiles, sanitaryware and brassware chosen, then one fixed price issued.
3–5 DAYS
- 03
Strip-out & first fix
Room taken to structure, pipework and electrics replaced and tested.
3–5 DAYS
- 04
Waterproofing & flood test
Membrane applied and the room flooded for 24 hours with records taken.
3 DAYS
- 05
Tiling, fit-out & handover
Screed, tiling, sanitaryware, glass and vanity, then snagging and warranty.
7–10 DAYS
Materials and finishes we work with
- Sika & Fosroc tanking membranes
- Large-format porcelain and stone-effect tile
- Duravit & Villeroy & Boch sanitaryware
- Grohe & Hansgrohe brassware
- 10mm toughened shower glass
- Linear stainless channel drains
- Moisture-resistant vanity carcasses
- Anti-fog LED mirrors
- Mapei tile adhesive and grout
- Silent inline extract fans
We use system-warranted waterproofing rather than mixed products, because manufacturer warranties are void the moment a membrane, primer and tape come from different systems. Test records and product data sheets are handed over with the room.
Recent bathroom renovation projects
How much does a bathroom renovation cost in Dubai?
STARTING FROM AED 35,000
STANDARD
AED 35,000 – 55,000
- Guest or small family bathroom
- Local porcelain and mid-range sanitaryware
- Waterproofing, flood test and new vanity
PREMIUM
AED 55,000 – 110,000
- Master en-suite with walk-in shower
- Large-format tile and frameless glass
- European brassware and stone vanity top
LUXURY
AED 110,000+
- Book-matched marble and feature lighting
- Freestanding bath and steam shower
- Underfloor heating and automation
Bathrooms are priced per room against the chosen sanitaryware and tiling. Waterproofing and flood testing are always included in the base price — they are never an optional line on our quotes.
REQUEST A DETAILED ESTIMATETrusted across Dubai and Abu Dhabi
200+ bathrooms rebuilt with flood-test records
“They sent photographs of the flooded shower tray before tiling started. After a leak from a previous contractor's work, that level of proof was exactly what we needed.”
Bathroom Renovation questions, answered.
Two to three weeks per bathroom, including three days of waterproofing and flood testing that cannot be rushed without risking the whole room.
It is the only way to prove the membrane and its junctions hold before they are covered. We fill the tray and floor area, mark the level, and photograph it at the start and end.
Yes, and doing so reduces cost because drainage stays where it is. Moving a WC is the most expensive change since it needs the right fall to the soil stack.
Yes, and running them in parallel or in a rolling sequence saves both time and money. We always keep at least one bathroom usable in an occupied home.
We install or upgrade an inline extract fan sized to the room volume, with a run-on timer. Poor extraction, not poor tiling, causes most mould complaints in UAE bathrooms.
Yes, electric mat systems under the tile with a programmable thermostat. It is uncommon here but popular in villas with marble floors.
Fifty per cent on mobilisation to cover materials and sanitaryware, and fifty per cent on snag-free completion.