— HOME RENOVATION
Family Villa Renovation
Strip-out and rebuild of a 2004 villa: new MEP, reconfigured ground floor, re-waterproofed terraces and full refinishing.
VILLAEMIRATES HILLS28 WEEKS
— 01 / THE BRIEF
What the client asked for.
A 2004 Emirates Hills villa with original MEP, failing terrace waterproofing and a compartmented ground floor. The family wanted the ground floor opened into connected living space without losing a formal majlis, and every service replaced so the house would not need touching again for fifteen years.
— 02 / SCOPE OF WORK
What we delivered.
- Full strip-out to structure across 8,400 sq ft
- New distribution boards, pipework and AC
- Ground floor opened with consultant drawings
- Terraces stripped and re-waterproofed with flood test
- Six bathrooms rebuilt
- Emaar NOC and Dubai Municipality modification permit
— 03 / BEFORE & AFTER
The same space, twice.
— 04 / SPECIFICATION
Materials used.
- Large-format porcelain
- Sprayed lacquer joinery
- Quartz worktops
- Travertine terrace
- DURATION
- 28 weeks
- AREA
- Emirates Hills
- PROPERTY
- Villa
“They opened up ceilings before quoting, so the price at week 28 was the price we signed in week zero.”
— 05 / SERVICES INVOLVED
How this project was delivered.
— REQUEST / FREE QUOTE
Get a free quote
We'll call you back within one business day.
— NEXT / YOUR PROJECT
Want something like this?
Free site visit, measured survey and a written fixed-price quotation within three working days.